Next Year's AI Productivity Number Will Be the Team That Stayed

November 24, 2026

Watch the video version:

In February, Block cut nearly 40% of its staff, more than 4,000 people, leaving just under 6,000. Jack Dorsey's letter to shareholders said the business was strong, and that a significantly smaller team using the tools Block builds could do more and do it better. That letter is a forecast. Next year, Block's revenue per employee will be read as its proof.

It will rise no matter what the tools do. Hold revenue flat, cut the headcount, and the ratio climbs on arithmetic alone. Nothing in that number says how much came from the tools and how much came from the people who stayed and picked up the work.

Salesforce is a year further along. In September 2025, Marc Benioff said on a podcast that he had taken support from about 9,000 people to about 5,000, with AI handling about half the conversations and satisfaction holding steady. The numbers that were reported were the tool's share and the satisfaction score. None of the coverage reported what happened to the caseload of the 5,000. This year, Salesforce's growth slowed to about 10%, and its investors are asking when the AI returns arrive.

The usual way to show AI is paying off is output per head: revenue per employee, pull requests per engineer, tickets per agent. If output held after the cut and the per-head number went up, the tool is credited with the gain. Revenue per employee is the clearest case. It's a ratio, and the cut itself is the bottom half of it, so it rises the day headcount drops, before any tool has done anything. Every per-head measure works the same way. The cut moves the number, and so do the extra hours the people who stayed put in. The tool gets credit for both.

Here is what the number can't see. When the cut lands, the work those people did doesn't leave with them. Someone picks up the on-call rotation, the code reviews, and the customer escalations. The Design Load on every seat that stayed goes up, and nobody works it out again for the work actually in front of it. The dashboard holds steady because the people who stayed are covering. Their hours aren't on the dashboard. Neither is the work they stopped doing to make room: the refactor that keeps waiting, the review that turns into a skim, the new hire nobody has time to train. In a self-reported survey of 1,250 US workers this February, 45% said their managers cite AI when handing them more work.

Then the covering becomes the baseline. Next year's normal output assumes the extra hours, so a team that goes back to normal hours reads as a decline. The skipped refactor comes due as an incident, and it's logged as an engineering failure, not as a cost of the cut. The people who carried the most, the ones running past their Bearing Capacity, go quiet and then resign, and the departure reads as ordinary attrition. None of it is ever counted against the gain. The people who survive a cut rarely say any of this out loud in the first year, so nothing on the dashboard contradicts the number.

You will be handed that number in the 2027 review. It will say the team became more productive, and it will be right about the output and wrong about the cause. Some of the gain is the tool. The number can't tell you which part, and the plan that made the cut will read its own result as proof. The next cut is sized on it.

The leaders who read next year's number correctly aren't better at measuring productivity than you. They wrote down where the work went before the number came out.

The fix isn't a better productivity metric. It's a record of where the work went. For each role the cut removed, write down what that person carried and whose seat it landed on. That's working out the Design Load again for the seats that stayed, which is the step the cut skipped. When the gain is reported next year, you can read it against the record and see which part the tool did and which part a person picked up. A gain that holds up against the record is real, and you can make decisions on it. A gain that doesn't was hours.

This is easier now than it will be next December. Today, everyone remembers who took over the on-call rotation. In a year, that will just be how the team works, and the covering will be the baseline.

Four questions about your own team. For each role cut in 2026, can you name who carries each piece of its work now? Since the cut, has anyone worked out again what each seat that stayed actually carries? Is any of that work simply not getting done: the refactor, the reviews, the onboarding? When the 2027 AI gain is reported, will the report say how many hours produced it, or only how much output? A no on the first, second, or last, or a yes on the third, means the number will credit the tool with your team's hours.

This week, take one role that left in 2026. List what it carried, and next to each item, write the name of whoever carries it now. If an item has no name, then either the tool is doing it or nobody is. You should know which before the number comes out.

The Structural CTO™ works out what each seat demands and what the person in it can carry, the read every cut skips and every gain report needs: https://TheStructuralCTOBook.com

Why a company paid like a thirty and built like a ten is already paying for the lag, and how to see a cost the P&L never shows. (Chapter 1)

Anthony S. Jackson

Anthony S. Jackson

Anthony S. Jackson has spent 30 years inside technical organizations. He is the author of the Architecture Protocol Series: three books on the structural problems technical leaders were never told they would face. He writes the LeadershipOS™ Inner Circle, a monthly printed newsletter for CTOs and engineering managers who design teams that hold under pressure.

LinkedIn logo icon
Back to Blog